Construction heating

Enjoy natural gas right from the start of your project

The advantages of heating your construction sites with natural gas

No need to stop building construction during cold weather—a natural gas heating unit for construction sites can keep your project warm. Even if it doesn’t use natural gas as its permanent source of energy, you can still use it to supply a heating unit for your construction site. You’ll save money and the inconvenience of using propane tanks.

During cold spells, Énergir will temporarily agree to the supply of natural gas, as this type of application is similar to an industrial use for which there is no technological alternative that can be powered by electricity.

Chart comparing annual energy costs1 equivalent to 63,128 m3 (100% heating).

Decrease energy costs

Reduce your operating costs by using a natural gas heating unit on your construction site. Natural gas offers so much more than superb performance—it’s less expensive than propane.

Reduce your costs and increase profitability

  • Continuous supply—no empty tank problem.
  • No need for nightly and weekend supervision.
  • No need to monitor and manage tank refills.
  • No soil decontamination costs from diesel tanks leaks



Increase workplace safety

  • Reduces risk of handling propane tanks and other fuels, such as diesel.
  • Natural gas is lighter than air and dissipates faster than propane in the event of a leak



Improve management and only pay for what you use

  • Natural gas is billed monthly—no more order forms to sign on the construction site.
  • No fuel loss: up to 10% of gas is lost because propane cylinders are never completely empty.

Questions and Answers

Is construction heating subject to the 100% renewable new connections initiative?

No. During cold spells, Énergir will temporarily agree to the supply of natural gas, as this type of application is similar to an industrial use for which there is no technological alternative that can be powered by electricity.

Questions and Answers

How can I get a heating unit for a construction site?

Simply contact your sales representative or an Énergir Partner.

1 800 567-1313  or   Write us

Questions and Answers

How long does it take to get connected?

A series of deadlines must be arranged, so it’s never too early to make your request. It usually takes about six weeks to install a new connection, or about nine weeks if the gas network must be extended. The meter is installed on the same day as the connection is made.

Question and answers

Where can we find construction heating equipment?

They can be rented from several suppliers. Here are a few:

Pyro Air                 Simplex
Dickie Moore         Polygone

    Question and answers

    Who install this equipment?

    An Énergir Partner or a certified natural gas plumbing contractor must do the installation. Then an Énergir technician will follow-up to confirm the installation and start the metre.

      610x300 Construction 50238

      Questions about the progress of your file?

      514 598-3880

      Contact the Customer Acquisitions and Retention Co-ordinator

      Grants available

      Your customers can benefit from Énergir grants to integrate natural gas into your construction projects. Our dedicated team of experts will be sure to meet your needs.


      Call us at 1 800 567-1313   or    Contact us

      1. The rebates are applicable to businesses located on the Énergir gas network and equipped with central heating appliances, provided that they do not have a heat pump or dual-energy heating system. The amount of financial assistance is based on expected natural gas consumption, the type of appliance to be installed and the total amount of the investment. The 15% total corresponds to a potential customer who installs a natural gas warm-air furnace with a capacity of 10,000 m3. The rebates are subject to credit approval and eligibility for the natural gas Consumption Rebate Program and the Energy Efficiency Program. The terms and conditions of the program and the amounts of financial assistance are subject to change without notice. A five-year natural gas supply contract is required. Other conditions may apply. The financial assistance will only be paid once the natural gas appliance(s) is(are) installed. The eligibility criteria are listed in the Consumption Rebate Program guide approved by the Régie de l’énergie, a copy of which may be obtained on request.

      2. The rebates are applicable to businesses located on the Énergir gas network and equipped with oil-fired central heating appliances, provided that they do not have a heat pump or dual-energy heating system and that the expected new natural gas appliance consumption is at least of 3,600m3 of natural gas. Other conditions may apply. The terms and conditions of the program and the amounts of financial assistance are subject to change without notice. To benefit from this grant, you must sign a contract with Énergir or an Énergir  Partner first.

      1-2: The cost to switch to natural gas includes a basic connection charge of $300. An additional cost may apply if an extension to the natural gas network is needed, plus an additional contribution based on the expected consumption of natural gas. 

      3. According to the prices in effect from July 1, 2021 to August 31, 2022. Based on Énergir rates and those of Hydro-Québec approved by the Régie de l’énergie; takes into account base electric consumption and rack price of oil with 2% sulfur including, in particular, transport, distribution and CATS.